Note Papa King — Reading the Data, Verifying the Facts, Demanding Answers
SAMARINDA, MJ – The mini-competition for the procurement of construction works through the Electronic Catalogue for the Jaya Makmur Road Reconstruction (Budget Reallocation) package in Sanga-Sanga District, East Kalimantan Province, has come under scrutiny after four providers submitting lower bids were disqualified. Meanwhile, the provider offering the highest bid was declared the winner.
Based on screenshots of the competition results on the INAPROC system obtained by the editorial team, five providers submitted bids. All bids were recorded as reasonable, but only the fifth-ranked provider was declared the winner.
The first-ranked provider submitted a bid of Rp17,840,466,449. However, the provider failed the qualification and technical evaluations. The second-ranked provider offered Rp18,023,309,385 but failed the administrative evaluation for not submitting the RKK form.
The third-ranked provider, with a bid of Rp18,320,575,197, was declared unsuccessful in both the administrative and qualification evaluations. Meanwhile, the fourth-ranked provider, which offered Rp18,853,845,424, failed the technical evaluation.
The fifth-ranked provider, with a bid of Rp19,824,829,103, was subsequently declared the winner of the mini-competition.
The difference between the lowest bid and the winning bid reached Rp1,984,362,654, equivalent to approximately 11.12 percent of the lowest bid.
These data do not establish that the winner was predetermined or that state financial losses occurred. Nevertheless, the disqualification of four providers offering lower prices warrants further examination through the evaluation documents, particularly to ensure that all requirements were applied consistently and were not changed after the competition had commenced.
Another issue requiring clarification concerns the bid security or bank guarantee requirements. The editorial team is seeking confirmation as to whether these requirements were included in the competition documents from the outset, whether they applied equally to all participants, and whether they were ever used as grounds for disqualifying any provider.
In government procurement, administrative, qualification, and technical requirements must be based on the provisions announced to all participants. Such requirements should not be applied differently without a clear and legally accountable basis.
The implementation of the competition also requires examination. Under the applicable regulations governing procurement through the Electronic Catalogue, the authority to conduct mini-competitions and the evaluation stages must comply with prevailing rules. It is therefore necessary to establish who conducted the competition—whether the Procurement Selection Working Group or the Commitment-Making Official (PPK)—and the legal basis for that authority.
The editorial team also noted a package value of Rp20,057,062,320, as stated in the data received. This figure needs to be cross-checked against the budget and contract documents to establish whether it represents the budget ceiling or the actual contract value.
In light of these questions, the PPK and the parties responsible for conducting the mini-competition are expected to provide an open explanation, including the evaluation minutes and the basis for determining the winning provider.
If errors in the evaluation, inconsistent application of requirements, or procedural violations are identified, the competent authorities should consider corrective measures, including cancellation and a repeat competition, provided that the applicable legal grounds are met.
As of the preparation of this report, the editorial team had not received an official explanation from the PPK or the parties responsible for the mini-competition regarding the detailed reasons for disqualifying the four providers. The editorial team remains open to receiving responses and clarifications from all relevant parties.
Before this report was published, the editorial team had submitted a request for clarification to the committee. However, no response had been received at the time of publication.
INVESTIGATION CODE: MJ-INV-KALTIM-2026
NEWS CODE: MJ-PPK-KALTIM-2026-001
© 04 November 2026 Mediajakarta.co.id. All rights reserved.